Our Process

Modgill Sign: Business to Execution


  • Production Manager & Project Manager plans the installation.
  • Installation teams are aligned as per the scope of work on site.
  • Project Manager intimates local team / retailer and procures required permissions (if any).
  • Team ensures all products are safely packed and installation apparatus are as per the site requirements.
  • On site works are started ensuring the minimalistic flow of customers and footfalls ensuring smooth installation process.
  • Installation supervisor intimates the local team (client) and the project manager about the completion before leaving the site with satisfactory certification from the dealer.

  • All products are thoroughly packed using blister sheets, corrugated sheets, wooden crates as per the product and its geography of dispatch / installation from the production hub ensuring the damage free mobilization to site.
  • Company has inhouse fleets with trained drivers for round the clock dispatch and mobilities.
  • Partnered with renowned, reliable courier and road transport service providers for on time delivery at outstation locations.
  • Post dispatch monitoring system to track the accuracy of delivery.

    Prevent

    minimalize use of environmental harming elements

    Reduce

    the wastage of products

    Reuse

    refurbish reusable elements

    Recycle

    scrap and recycle (acrylics)

    Recover

    sorting of left over elements

    Dispose

    waste outputs which are non-recyclable are handed over to solid waste management agencies